These
Are Covered Over With 4-Inch Planking, And The Beams Are Strutted On
Either Side From The Trestle And From The Crib.
The covering is placed
at such a height as to give 21 feet headway from the under side of the
beam to the centre of the track.
The longest of these sheds is 3,700
feet, and is near the Glacier Hotel.
"Over the Selkirk Range the schedule time for trains from Donald to
Revelstoke, that is, from the first to the second crossing of the
Columbia River, a distance of 79 miles, is only eleven miles an hour;
but this time table was made before there was much ballast on this
portion of the line, and better time can now be made. On the 21st
September the Fraser River was crossed early in the morning over a
steel cantilever bridge, and the line runs down the gorge of the Fraser
River to Port Moody, reached at noon. The train had thus been
travelling from 8 p.m. on the 15th September to 12 noon on the 21st,
apparently a total of 136 hours; but, allowing for the gain of three
hours in time, an actual total of 139 hours. During this time the train
travelled 2,892 miles, or an average speed made throughout the journey,
including all stoppages, of 20-1/2 miles per hour, and this is the
regular schedule time for passenger trains at the present time.
"Port Moody is the present terminus of the Canadian Pacific Railway,
but the line has been partially graded for 12 miles further to
Vancouver.
Enter page number
PreviousNext
Page 52 of 492
Words from 13709 to 13976
of 136421