From The North Shore Of Lake Nipissing To
This Point, However, A Distance Of Over 600 Miles, The Country May Be
Said To Be Almost Without Inhabitants, Except Those Connected With The
Working Of The Railway, Squatters, And Hudson's Bay Trappers And
Traders.
The weather was chilly during the evening of this day, and a
heavy sleet storm arose before arriving at Port Arthur.
At night a fire
had to be lighted in the car, as there was a sharp frost. During the
night the train was detained for some little time east of Rat Portage,
in consequence of a trestle having given way while being pulled in, and
the train arrived at Rat Portage at 7.30 a.m., four hours, behind time.
"From Port Arthur the line westward is run upon the 24 o'clock system,
commencing from midnight; 1 p.m. being 13 o'clock, 2 p.m. being 14
o'clock, and so on. The train arrived at Winnipeg at 12.45 on the 18th
(1,423 miles from Montreal), and time was allowed to drive round the
town, the train leaving again for the west at 13.30 o'clock. From
Winnipeg westward the line runs through a prairie country, which
extends without intermission to Calgary, a distance of 838 miles, and
2,261 from Montreal. At Winnipeg the Company have good machine shops,
round houses, &c., and a large yard, and has acquired 132 acres of land
for these purposes of working and repair and renewal.
"The country for three or four hundred miles from Winnipeg west is more
or less settled; in some parts farms are quite numerous, and the land
good and well cultivated. At Portage la Prairie the Manitoba and North-
Western Line leaves the Canadian Pacific. It is being rapidly pushed
forward, and 120 miles of it have already been completed through the
'Fertile belt.' It should have been mentioned that the line between
Port Arthur and Winnipeg, a length of 430 miles, was constructed by the
Government of Canada and given to the Canadian Pacific Railway Company
free as a portion of their system. This part of the line is laid with
57 lbs. steel rails, and is well ballasted. The line is also ballasted
east of Port Arthur, though in some places the ballast is of poor
quality, and in others there is not sufficient of it. West of Winnipeg,
however, there is no ballast across the prairie, except where the
excavations through which the line goes afford ballast, it being simply
surfaced up from side ditches with whatever the material may happen to
be; but it is in good condition for a line of such a character, and the
schedule time is 24 miles an hour, including stoppages.
"The train ran through Qu'Appelle, Regina, and Moose Jaw during the
night of the 18th, and reached Dunmore (650 miles from Winnipeg) at
15.30 o'clock on the 19th. At this point there is a branch, 3-feet
gauge line, 110 miles in length, to the Lethbridge mines, belonging to
Sir Alexander Galt & Company.
Enter page number
PreviousNext
Page 25 of 259
Words from 12561 to 13072
of 136421