In Any Circumstances The Task Would Have Been Enormous.
It was, however,
complicated by five important considerations:
It had to be executed with
military precautions. There was apparently no water along the line.
The feeding of 2,000 platelayers in a barren desert was a problem in
itself. The work had to be completed before the winter. And, finally,
the money voted was not to be outrun. The Sirdar attended to
the last condition.
Girouard was sent to England to buy the plant and rolling stock.
Fifteen new engines and two hundred trucks were ordered. The necessary new
workshops were commenced at Halfa. Experienced mechanics were procured to
direct them. Fifteen hundred additional men were enlisted in the Railway
Battalion and trained. Then the water question was dealt with.
The reconnoitring surveys had reported that though the line was certainly
'good and easy' for 110 miles - and, according to Arab accounts, for the
remaining 120 miles - no drop of water was to be found, and only two likely
spots for wells were noted. Camel transport was, of course, out of the
question. Each engine must first of all haul enough water to carry it to
Railhead and back, besides a reserve against accidents. It was evident that
the quantity of water required by any locomotive would continually increase
as the work progressed and the distance grew greater, until finally the
material trains would have one-third of their carrying power absorbed in
transporting the water for their own consumption. The amount of water
necessary is largely dependent on the grades of the line.