The River War - An Account Of The Reconquest Of The Sudan By Winston S. Churchill

















































 -  Until the railway was forced on to Berber
a peculiarly inconvenient line of supply had to be used; and strings - Page 123
The River War - An Account Of The Reconquest Of The Sudan By Winston S. Churchill - Page 123 of 248 - First - Home

Enter page number    Previous Next

Number of Words to Display Per Page: 250 500 1000

Until The Railway Was Forced On To Berber A Peculiarly Inconvenient Line Of Supply Had To Be Used; And Strings Of Camels, Scattering Never Less Than 30 Per Cent Of Their Loads, Meandered Through The Rough And Thorny Country Between Merawi And Abu Hamed.

This line was strengthened by other convoys from Murat and the approaching Railhead, and a system of boats and camel portages filtered the supplies to their destination.

Even when the railway had reached Dakhesh the tension was only slightly relaxed. The necessity of supplying the large force at Berber, 108 miles from Railhead, still required the maintenance of a huge and complicated system of boat and camel transport. Of course, as the railway advanced, it absorbed stage after stage of river and portage, and the difficulties decreased. But the reader may gain some idea of their magnitude by following the progress of a box of biscuits from Cairo to Berber in the month of December 1897. The route was as follows: From Cairo to Nagh Hamadi (340 miles) by rail; from Nagh Hamadi to Assuan (205 miles) by boat; from Assuan to Shellal (6 miles} by rail; from Shellal to Halfa (226 miles) by boat; from Halfa to Dakhesh (Railhead) - 248 miles - by military railway; from Dakhesh to Shereik (45 miles) by boat; from Shereik by camel (13 miles) round a cataract to Bashtinab; from Bashtinab by boat (25 miles) to Omsheyo; from Omsheyo round another impracticable reach (11 miles) by camel to Geneinetti, and thence (22 miles) to Berber by boat. The road taken by this box of biscuits was followed by every ton of supplies required by 10,000 men in the field. The uninterrupted working of the long and varied chain was vital to the welfare of the army and the success of the war. It could only be maintained if every section was adequately supplied and none were either choked or starved. This problem had to be solved correctly every day by the transport officers, in spite of uncertain winds that retarded the boats, of camels that grew sick or died, and of engines that repeatedly broke down. In the face of every difficulty a regular supply was maintained. The construction of the railway was not delayed, nor the food of the troops reduced.

The line continued to grow rapidly, and as it grew the difficulties of supply decreased. The weight was shifted from the backs of the camels and the bottoms of the sailing-boats to the trucks of the iron road. The strong hands of steam were directed to the prosecution of the war, and the swiftness of the train replaced the toilsome plodding of the caravan. The advance of the Dervishes towards Berber checked the progress of the railway. Military precautions were imperative. Construction was delayed by the passage of the 1st British Brigade from Cairo to the front, and by the consequently increased volume of daily supplies. By the 10th of March, however, the line was completed to Bashtinab.

Enter page number   Previous Next
Page 123 of 248
Words from 63006 to 63506 of 127807


Previous 123 124 125 126 127 128 129 130 131 132 Next

More links: First 10 20 30 40 50 60 70 80 90 100
 110 120 130 140 150 160 170 180 190 200
 210 220 230 240 Last

Display Words Per Page: 250 500 1000

 
Africa (29)
Asia (27)
Europe (59)
North America (58)
Oceania (24)
South America (8)
 

List of Travel Books RSS Feeds

Africa Travel Books RSS Feed

Asia Travel Books RSS Feed

Europe Travel Books RSS Feed

North America Travel Books RSS Feed

Oceania Travel Books RSS Feed

South America Travel Books RSS Feed

Copyright © 2005 - 2022 Travel Books Online